UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K/A
(Amendment No. 1)
(Mark One) | |
ý |
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the fiscal year ended December 31, 2004 |
|
OR |
|
o |
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to |
Commission file number 1-13627
APEX SILVER MINES LIMITED
(Exact Name of Registrant as Specified in its Charter)
Cayman Islands, British West Indies (State of Incorporation or Organization) |
Not Applicable (I.R.S. Employer Identification No.) |
|
Walker House Mary Street George Town, Grand Cayman Cayman Islands, British West Indies (Address of principal executive office) |
Not Applicable (Zip Code) |
|
(345) 949-0050 (Registrant's telephone number, including area code) |
||
Securities registered pursuant to Section 12(b) of the Act: |
||
Title of each class Ordinary Shares, $0.01 par value |
Name of each exchange on which registered American Stock Exchange |
|
Securities registered pursuant to Section 12(g) of the Act: None |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ý No o
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant's knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. o
Indicate by check mark whether the registrant is an accelerated filer (as defined in Rule 12b-2 of the Act). Yes ý No o
The aggregate market value of the voting and non-voting common equity held by non-affiliates as of June 30, 2004, was approximately $376.5 million, based on the closing price of the Ordinary Shares on the American Stock Exchange of $17.05 per share. The number of Ordinary Shares outstanding as of March 10, 2005 was 47,679,797.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the Registrant's Definitive Proxy Statement to be filed with the Securities and Exchange Commission pursuant to Regulation 14A in connection with the 2005 Annual Meeting of Shareholders are incorporated by reference in Part III of this Report on Form 10-K.
EXPLANATORY NOTE
This Amendment No. 1 (the "Amendment") on Form 10-K/A amends our annual report on Form 10-K filed with the Securities and Exchange Commission on March 16, 2005. We are filing this Amendment to make the following corrections:
This Amendment affects only the items described above and does not affect the financial statements and footnotes filed in the annual report. For ease of reference, we are re-filing all items of Form 10-K, with the exception of the financial statements and footnotes.
Some information contained in or incorporated by reference into this report on Form 10-K may contain forward-looking statements. These statements include comments regarding San Cristóbal development and construction plans, costs, grades, production and recovery rates, permitting, infrastructure arrangements, Bolivian political and economic conditions, financing needs, the availability of financing on acceptable terms, the timing of construction at San Cristóbal, and the markets for silver, zinc and lead.
The use of any of the words "anticipate," "continue," "estimate," "expect," "may," "will," "project," "should," "believe" and similar expressions are intended to identify uncertainties. We believe the expectations reflected in those forward-looking statements are reasonable. We cannot assure you, however, that these expectations will prove to be correct. Our actual results could differ materially from those anticipated in these forward-looking statements as a result of the risk factors set forth below and other factors set forth in, or incorporated by reference into, this report:
Many of those factors are beyond our ability to control or predict. You should not unduly rely on these forward-looking statements. These statements speak only as of the date of this report on Form 10-K. Except as required by law, we are not obligated to publicly release any revisions to these forward-looking statements to reflect future events or developments. All subsequent written and oral forward-looking statements attributable to Apex Silver and persons acting on our behalf are qualified in their entirety by the cautionary statements contained in this section and elsewhere in this report on Form 10-K.
1
CONVERSION TABLE
In this report, figures are presented in both United States standard and metric measurements. Conversion rates from United States standard to metric and metric to United States standard measurement systems are provided in the table below.
U.S. Unit |
Metric Measure |
Metric Unit |
U.S. Measure |
|||
---|---|---|---|---|---|---|
1 acre | 0.4047 hectares | 1 hectare | 2.47 acres | |||
1 foot | 0.3048 meters | 1 meter | 3.28 feet | |||
1 mile | 1.609 kilometer | 1 kilometer | 0.62 miles | |||
1 ounce (troy) | 31.103 grams | 1 gram | 0.032 ounces (troy) | |||
1 ton | 0.907 tonne | 1 tonne | 1.102 tons |
2
ITEMS 1 AND 2: BUSINESS AND PROPERTIES
Apex Silver Mines Limited, incorporated under the laws of the Cayman Islands in 1996, is engaged in the exploration and development of silver properties in South America and Mexico. We have a large diversified portfolio of privately owned and controlled silver exploration properties. We have rights to or control over 100 silver and other mineral exploration holdings, divided into approximately 50 property groups, located in or near the traditional silver producing regions of Bolivia, Mexico and Peru.
Our exploration efforts have produced our first development property, our 100% owned San Cristóbal Project located in southern Bolivia. San Cristóbal's proven and probable reserves, based on $5.37 per ounce silver, $0.40 per pound zinc and $0.28 per pound lead, total approximately 219 million tonnes of ore grading 64.69 grams per tonne silver, 1.60% zinc and 0.59% lead, containing approximately 456 million ounces of silver, 7.7 billion pounds of zinc and 2.8 billion pounds of lead. The prices used represent the three year average price for each of the metals as per guidelines established by the Securities and Exchange Commission. None of our properties is in production, and consequently we have no operating income or cash flow.
As used herein, Apex Silver, we and our refer collectively to Apex Silver Mines Limited, its predecessors, subsidiaries and affiliates or to one or more of them as the context may require.
All currency references are to United States dollars, unless otherwise indicated.
AVAILABLE INFORMATION
We make available, free of charge through our Internet web site at http://www.apexsilver.com, our annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as soon as reasonably practicable after such material is electronically filed with or furnished to the SEC. Information on our website is not incorporated into this report and is not a part of this report.
BUSINESS STRATEGY
Apex Silver is one of a limited number of silver companies with significant exposure to other metals. Our strategy is to capitalize on the San Cristóbal Project and our sizeable portfolio of silver exploration properties in order to achieve long-term profits and growth and to enhance shareholder value.
Although our primary focus is on mining silver, we intend to produce other metals associated with our silver deposits if economically practicable, including zinc, lead, copper and gold. We are managed by a team of seasoned mining professionals with significant experience in the construction, development and operation of large scale, open pit and underground, precious and base metals mining operations, as well as the identification and exploration of mineral properties.
The principal elements of our business strategy are to:
3
SAN CRISTOBAL PROJECT
Our 100% owned San Cristóbal Project is located in the San Cristóbal mining district of the Potosi Department in southern Bolivia, a region that historically has produced a significant portion of the world's silver supply. San Cristóbal is located in the Bolivian Altiplano in the Andes mountains, approximately 500 kilometers south of the city of La Paz, which is the seat of government where executive and legislative powers reside. The project is accessible by a gravel road from the town of Uyuni, approximately 100 kilometers to the northeast and from the Chilean border town of Ollagüe, approximately 135 kilometers to the west. A railroad begins at the Chilean port of Antofagasta, approximately 460 kilometers southwest of San Cristóbal, and continues north to La Paz, passing 50 kilometers to the north of San Cristóbal. A spur is being built to connect the mine to the railroad for shipment of concentrates and receipt of imported supplies. The map below shows the location of the San Cristóbal project.
4
Silver was discovered in what is now the San Cristóbal district in the early seventeenth century, and mining has occurred intermittently in the area ever since. Although no records from the Spanish colonial era mines have survived, and few records exist with respect to production in the district during the nineteenth and twentieth centuries, we estimate that the district has produced millions of ounces of silver.
Other than sporadic underground mining in the area of the planned San Cristóbal pit over the previous 350 years, only one portion of the San Cristóbal project, the Toldos deposit, has been mined. The Toldos mine was operated by Empresa Minera Yana Mallcu S.A. as a block-caving underground operation between 1985 and 1988, and as an open-pit mine and silver heap leach between 1989 and 1995. The Toldos mine was shut down in 1995 and at present there is no significant mining or processing plant or equipment on the San Cristóbal property.
Beginning in 1993, our founders established certain companies to acquire and develop silver exploration properties throughout the world. Our predecessor companies acquired the concessions comprising the San Cristóbal Project from Bolivian companies and individuals in a series of transactions from 1994 through 1997. In 1996, our predecessors began exploring the San Cristóbal Project and discovered a significant silver, zinc and lead deposit with the potential to be developed as a large scale, open pit mine. Apex Silver Mines Limited was formed in March 1996 and acquired the San Cristóbal Project and other exploration properties in a series of transactions in 1996 and 1997. We completed the initial San Cristóbal feasibility study, conducted by Kvaerner Metals, Davy Nonferrous Division, in 1997. In December 1997, we completed our initial public offering.
The San Cristóbal property is comprised of certain mining concessions which are part of a large block of concessions covering approximately 471,000 acres which we own or control. In addition, we have acquired rights to approximately 17,000 acres for transportation and power lines. Under these mining concessions, we have the right to carry out exploration, mining, processing and marketing of all mineral substances located within the concessions, and to use the water found on the concessions. In order to maintain our rights to these concessions, we must make annual mining patent payments to the Bolivian government totaling approximately $360,000. We are not required to pay any royalties in respect of production from the San Cristóbal property.
In July 1999, we completed a detailed feasibility study on San Cristóbal. The feasibility study was prepared by Kvaerner, E&C Metals Division, an independent engineering firm. We subsequently selected Aker Kvaerner as the primary contractor at the project and they commenced detailed engineering. In September 2000, we completed a metallurgical update to the feasibility study which noted an improvement in the economics of the San Cristóbal Project as a result of certain positive metallurgical and operational factors.
In April 2001, due primarily to weak silver prices, we suspended detailed engineering for San Cristóbal and significantly curtailed expenditures on the project. This interruption continued for a period of nearly three years. During this period, we advanced the project primarily by continuing the evaluation and negotiation of infrastructure arrangements, including the selection of a port from which to ship the concentrates to smelters, arrangements for the transportation of concentrates from San Cristóbal to the port and the provision of power to San Cristóbal.
In 2004, based on improving silver and zinc prices, we retained Aker Kvaerner to complete an updated estimate of San Cristóbal capital and operating costs and an estimated project schedule. They completed this update during the third quarter of 2004 and in November 2004, we entered into an Engineering, Procurement and Construction Management ("EPCM") Agreement with Aker Kvaerner. Under the EPCM Agreement, Aker Kvaerner has agreed to complete detailed engineering, procure the necessary equipment and manage and oversee the construction and installation of the facilities at the San Cristóbal project.
5
The 2004 updated cost estimate prepared by Aker Kvaerner provided the basis for an updated development plan. We completed the development plan, a detailed plan for the development and construction of the San Cristóbal Project in November 2004. The development plan contemplates that we will mine the deposit from an open pit mine at the rate of approximately 40,000 tonnes of ore per day and process the ore by conventional flotation methods. Under the assumptions contained in the development plan, the mine is expected to have an average life-of-mine strip ratio, or ratio of waste material which must be removed for each tonne of ore recovered, of 1.56:1. We will transport mined ore to the primary crusher by truck and then convey the crushed ore to a mill and flotation plant with a design capacity of 40,000 tonnes per day. The ore will be ground in semi-autogenous (SAG) and ball mill circuits, and then processed by selective flotation to produce separate zinc-silver and lead-silver concentrates and lesser amounts of bulk lead-silver concentrates. Filtered concentrates will be transported by rail to the port in Mejillones, Chile, and then by ocean vessel to smelters and refineries in Asia, the Americas and Europe. The updated development plan projects a 16-year life. Our board of directors voted unanimously in December 2004 to approve development of the San Cristóbal project.
In connection with the completed development plan, we prepared an updated evaluation of capital cost for the San Cristóbal Project in October 2004. The capital cost estimate is approximately $560 million, $65 million or 13% more than estimated in the 2000 updated feasibility study. The increase in the estimated capital cost was due to changes in the infrastructure scope (including the decision to haul concentrates by rail rather than by truck), higher energy and raw material costs and other normal cost escalations. The capital cost estimate includes pre-stripping, engineering, procurement, construction, and freight necessary to commence production, as well as appropriate taxes, duties and levies under Bolivian law. The estimate excludes approximately $27 million of working capital, $22 million expected to be advanced to the company constructing the power line, $6 million expected to be advanced to the company constructing the port facilities, and $20 million for escalation from the original constant dollar estimate. Advances for the power line and port facility providers are expected to be recouped through credits applied against payments for the contracted services. The estimate also excludes approximately $12 million in capital costs related to production enhancements added subsequent to the October 2004 estimate. Total project funding from January 1, 2004 going forward, including the additional amounts described above, is approximately $650 million. Of this amount, approximately $26 million in capital costs was spent at the San Cristóbal project during 2004. In years prior to 2004, we have spent a total of approximately $98 million in project capital at San Cristóbal.
San Cristóbal is expected to produce an average of approximately 500,000 tonnes of concentrate per year over the life of the mine. Based on prices at $5.75 per ounce silver, $1,100 per tonne zinc and $660 per tonne lead, San Cristóbal is expected to have average annual payable production of approximately 17 million ounces of silver at an average cash operating cost over the 16-year mine life of $1.43 per ounce. This figure includes by-product credits related to the corresponding average annual production of approximately 64,000 tonnes of payable lead. The project is also expected to have average annual payable production of approximately 165,000 tonnes of zinc at an average cash operating cost of approximately $0.41 per pound. See "Management's Discussion and Analysis of Financial Condition and Results of Operation." The term "average cash operating cost" is a non-GAAP financial measure. The term is used on a per-ounce of payable silver and per-pound of payable zinc basis. Our estimated cash operating costs include estimated mining, milling and other mine related overhead costs. The per-ounce of silver cost also includes off-site costs related to projected silver refining charges. The per-pound of zinc cost also includes charges related to transportation of zinc concentrates and their projected treatment and smelting charges. All cash operating costs exclude taxes, depreciation, amortization and provisions for reclamation. The average cash operating cost per ounce of silver is equal to the pro-rata share of estimated average operating costs for the period reduced by the estimated value of lead by-product credits for the period divided by the number of "payable ounces". The lead by-product credits are net of charges related to transportation of lead concentrates and their projected treatment and smelting charges. The "payable ounces" are the estimated number of ounces of silver to be produced during the period reduced by the
6
ounces required to cover estimated refining, treatment and transportation charges for the period. Average cash operating cost per pound of zinc is equal to the pro-rata share of estimated average operating costs for the period divided by the number of "payable pounds". The "payable pounds" are the estimated number of pounds of zinc to be produced during the period reduced by the pounds required to cover estimated refining, treatment and transportation charges for the period. We have included estimated average cash operating cost information to provide investors with information about the cash generating capabilities of the San Cristobal Project. This information will differ from measures of performance determined in accordance with generally accepted accounting principles (GAAP) and should not be considered in isolation or as a substitute for measures of performance that will be prepared in accordance with GAAP. These measures are not necessarily indicative of operating profit or cash flow from operations to be determined under GAAP and may not be comparable to similarly titled measures of other companies.
Significant progress has been made in securing a stable power source for the project. The Bolivian government has extended the power grid to the town of Punutuma, approximately 180 kilometers northeast of San Cristóbal. We have entered into an agreement with a Bolivian company to extend the power line from Punutuma to San Cristóbal. The construction of this line is expected to be completed by mid-2006. Until the power line is completed, power for construction at the San Cristóbal Project will continue to be obtained from on-site generators.
We have begun construction during the first quarter of 2005 and expect to spend approximately $250 million in 2005 on equipment procurement, plant construction, infrastructure development, engineering and other costs related to our San Cristóbal Project during 2005. Aker Kvaerner should complete engineering and procurement during 2005 and major equipment components are expected to begin to arrive during the fourth quarter of 2005. In addition, we expect that certain infrastructure projects, including roads connecting the project with the Chilean border and with the town of Uyuni, will be completed in 2005. We anticipate that construction of certain mine surface facilities, well field development and prestripping at the mine area will commence during 2005.
During 2006, we expect the remaining concrete for the plant to be poured, with construction nearly complete by the end of 2006. We also anticipate that prestripping of the mine will continue throughout 2006 and will be nearly complete by the end of 2006. The power line to San Cristóbal should also be completed and commissioned during 2006. We anticipate production at the mine commencing in late 2007.
In January 2005, we entered into an Open Pit Contract Mining Services Agreement with Washington Group Bolivia S.R.L. under which Washington Group agreed to provide contract mining services for project. These services will include construction and maintenance of site access and haul roads, open pit preproduction stripping, mining of ore and waste, construction and management of waste dumps and ore stockpiles, and various other contract mining services.
During 2005, we expect to complete engineering and finalize our arrangements for the use of the port in Mejillones, Chile to store, load and export concentrates and for the rail transportation of concentrates from San Cristóbal. In 2003, we entered into a contract for the long-term use of the port in Mejillones. The contract is subject to typical conditions precedent, including obtaining necessary approvals from Chilean authorities and the closing of debt financing for the project. Many of these conditions precedent, including the receipt of the necessary permits from Chilean authorities, have been completed and we expect the remaining conditions to be met in 2005. Also in 2003, we entered into a letter of intent for the truck and rail transport of concentrates from San Cristóbal to the port in Mejillones. During 2004, however, we determined that the most efficient means of transporting concentrates from San Cristóbal will be primarily by rail, rather than the combination of truck and rail as contemplated by the letter of intent. We are currently negotiating the terms of a contract for the transport of concentrates solely by rail. We expect to have the contract completed during the second quarter of 2005.
7
We have secured the necessary permits for the construction of the San Cristobal Project. Prior to production, additional permits must be obtained for certain ancillary activities at the site, such as the storage of explosives and fuel. We or one of our contractors have also secured the necessary permits for certain infrastructure items, including the construction of the roads connecting the plant with the Chilean border and with the town of Uyuni and the permit for the receipt, storage and shiploading of concentrates at the port in Mejillones. We expect that the remaining infrastructure permits, including the permit for the construction of the rail spur to the site, the permit from Chile for rail transport of the concentrate and the permit for the construction of the power line from the town of Punutuma, will be obtained prior to the end of 2005.
The San Cristóbal Project will produce zinc, silver, and lead contained in three separate sulfide flotation concentrates: zinc concentrate, lead concentrate and a bulk/low grade lead concentrate. The concentrates will be transported by rail to Mejillones, where the concentrates will be shipped by bulk carrier to smelters around the world. We have signed non-binding letters of intent with several smelters in Europe, North and South America, and Asia and are in the process of developing long-term contracts with those smelters for the purchase of the San Cristóbal zinc, lead and bulk concentrates. We expect that many of these contracts will be completed by mid-2005.
Geology
The San Cristóbal Project occupies the central portion of a depression associated with volcanism of Miocene age. The four kilometer diameter depression is filled with fine to coarse grained volcaniclastic sedimentary rocks (including shale, conglomerate, sandstone, landslide debris and talus). During the late Miocene Period, after sedimentation had nearly filled the depression, a series of dacite and andesite porphyry sills and domes intruded the volcaniclastic rocks. Disseminated and stockwork silver-lead-zinc mineralization formed locally both within the volcaniclastic sediments and in the intrusions themselves. The disseminated mineralization was not mined in the past except at the nearby Toldos mine. Historic production on the San Cristóbal property was from veins.
The two largest areas of mineralization, the Jayula and Tesorera deposits, initially were drilled separately. Our additional drilling in 1998, which more than doubled proven and probable reserves, merged the Jayula and Tesorera deposits into one large deposit, now called the San Cristóbal orebody.
Mineralization at the Jayula portion of the San Cristóbal orebody is dominated by stockwork consisting of iron oxides, clays, galena, barite, sphalerite, pyrite, tetrahedrite and acanthite. The veins of the stockwork are most abundant in the dacite sill, near its contact with the volcaniclastic sedimentary rocks. At the Tesorera portion of the orebody, mineralization is characterized by galena, sphalerite and acanthite, disseminated in the volcaniclastic sedimentary rocks. This mineralization is most prevalent in the coarser grained beds, usually conglomerates and coarse sandstones. To the extent that ore grade mineralization is confined to the sedimentary beds, the mineral zones are both stratiform and strata-bound, forming tabular bodies.
Oxidation of the mineralized zone at San Cristóbal has occurred to depths averaging 40 to 75 meters and affects approximately 4% of the reserves. In this oxide zone, zinc has been almost completely leached out by groundwater; silver values, however, are locally enhanced due to secondary enrichment processes. In the oxide zone, the dominant minerals are iron oxides, galena, clays, native silver and secondary acanthite.
Reserves
We have completed 539 reverse circulation drill holes, for a total of approximately 169,400 meters, and 85 diamond drill core holes for approximately 20,000 meters, at San Cristóbal. The drill holes were generally spaced at intervals of approximately 75 meters. This drilling indicates that the mineralization is
8
present over an area of 1,500 meters by 1,500 meters. The ore deposit defined by this drilling is open at depth and in several lateral directions.
The QA/QC program used at San Cristóbal included regular insertion and analysis of blanks and standards to monitor laboratory performance. Blanks are used to check for contamination and standards are used to check for grade-dependent biases. Duplicate samples were routinely submitted to different laboratories for assay, with the results of these check assays analyzed in total and separately by deposit, drill type and grade. We conducted confirmation drilling, both our own twinning of reverse circulation holes with diamond core holes and independent confirmation drilling by an independent firm.
Proven and probable reserves were recalculated in February 2005 using a $6.40 net smelter return per tonne cutoff value for oxides, a $5.19 net smelter return per tonne cutoff value for sulfides and market price assumptions of $5.37 per ounce silver, $0.40 per pound zinc and $0.28 per pound lead. These prices represent the three year average prices for each of the metals through December 2004 as per guidelines established by the Securities and Exchange Commission. The following table shows our proven and probable reserves of silver, zinc and lead for sulfide ore and oxide ore at the San Cristóbal Project. Our reserves were calculated by Mine Reserve Associates, Inc., using a fully designed pit that incorporates design slopes, practical mining shapes and access ramps.
|
Proven and Probable ReservesSan Cristóbal Project |
|||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
Average Grade |
Contained Metals(1) |
|||||||||||
|
Tonnes of ore (000s) |
Silver Grade (g/tonne) |
Zinc Grade (%) |
Lead Grade (%) |
Silver Ounces (000s) |
Zinc Tonnes (000s) |
Lead Tonnes (000s) |
|||||||
Sulfide Ore | 209,431 | 61.64 | 1.67 | 0.59 | 415,044 | 3,497 | 1,236 | |||||||
Oxide Ore | 9,599 | 131.39 | 0.10 | 0.63 | 40,549 | 10 | 60 |
Republic of Bolivia
Bolivia is situated in central South America and is bordered by Peru, Brazil, Paraguay, Argentina and Chile. It has an area of approximately 1.1 million square kilometers and a population of approximately 8.5 million people. Bolivia's official and most widely spoken language is Spanish, but a large sector of the population is either native Aymara or Quechua Indian.
Bolivia has experienced slow economic growth and political instability in the last three years. In late 2003, there were violent demonstrations in La Paz and elsewhere in Bolivia, protesting, among other things, the proposed export of natural gas to the U.S. through Chile. These demonstrations resulted in the resignation of President Sanchez de Lozada, in October 2003, and his constitutional replacement by President Mesa. Demonstrations have continued in 2004 and early 2005, focused on, among other things, the opposition of certain political parties to a proposed statute regulating oil and gas development in Bolivia. As proposed, the new law would provide incentives for foreign investment and increase taxes and royalties on oil and gas production. Following a period of demonstrations, President Mesa resigned in early March 2005. The Bolivian Congress rejected his resignation, and President Mesa has agreed to continue to serve as President based on agreements regarding passage of a new oil and gas statute and progress on certain other initiatives. The remaining opposing political party continues its active opposition. To date, there have been no formal proposals to impose royalties or increase taxes on the mining industry. Although to date these conditions and events have not caused any adverse impact on our San Cristóbal
9
project, political and economic uncertainties and instability continue and may not be resolved successfully. The political and economic climate may become more unstable, and political and economic uncertainties may in the future have an adverse impact on the development or operations of San Cristóbal.
Bolivian law provides for unrestricted repatriation of capital, freedom to import goods and services and equality under the law between foreign and domestic companies.
Mining companies in Bolivia are subject to a 25% income tax, with taxable income determined in accordance with Bolivian generally accepted accounting principles. Mining companies are also subject to a complementary mining tax (CMT) which is creditable against the income tax. The amount of the CMT is equal to the value of the concentrate multiplied by a tax rate, which ranges from 1% to 5% for zinc and lead concentrates. The value of the concentrate is approximately equal to the amount of contained metals in the concentrate multiplied by a commodity price that is published by the Bolivian government. Historically, these prices have been approximately equal to market prices. In addition, Bolivian source income, including dividends and interest, is subject to a 12.5% withholding tax. Other taxes include import duties of 5% on capital goods and 10% on other imports, and value added tax (VAT) of 13%. As an exporter, we will be able to apply for a refund of import duties, however, the amount recoverable is limited to 5% of the net value of our exports. We will also be able apply for a refund of VAT paid on imports and raw materials included in the cost of exported goods, but the amount recoverable is limited to 13% of the net value of our exports. For the purpose of determining the cap on refunds for both import duties and VAT, the net value of our exports is equal to the gross value of our exports reduced by certain statutory deductions. A Biministerial Resolution, enacted in August 2004, gave further definition to a series of Supreme Decrees that allow mining enterprises established in the Department of Potosi to import certain plant and equipment tax-free. The exemption applies only to concentrating, smelting, or refining activities and requires that certain procedures be followed to specifically identify the equipment eligible for tax-free treatment prior to importation. We have begun the process to apply for this exemption for the San Cristóbal project. The potential benefits we may obtain under these laws are not included in our capital estimates for the project.
All mineral deposits in Bolivia are the property of the State. Mining concessions awarded by the State grant the holder, subject to certain payments, the exclusive right to carry out prospecting, exploration, exploitation, concentration, smelting, refining and marketing activities with respect to all mineral substances located within a given concession. Under Bolivian law, local and foreign companies are treated equally in obtaining mineral concessions. With respect to nationalized and other concessions still held by State-owned Comibol, private investors may inter into joint venture, lease or services agreements with Comibol. Holders of mining concessions are obliged to pay an annual mining patent, the fees for which are progressive and are based on the number of years of existence of the concession. Mining concessions are liable to forfeiture when the corresponding annual patent fails to be paid. Concessions established before the enactment of the New Mining Code in 1997 which comprise an area of more than 1,000 mining claims pay the equivalent of $1.00 per claim per year for the first five years of the existence of the concession; thereafter, the patent increases to the equivalent of $2.00 per claim per year. Concessions established under the New Mining Code pay the following: for the first five years of the existence of a concession, the owner is required to pay the equivalent of $25.00 per cuadrícula (equivalent to 25 hectares) per year; thereafter the patent increases to the equivalent of $50.00 per cuadrícula per year. Most of our material Bolivian concessions were established prior to enactment of the New Mining Code.
Bolivia has a national environmental policy to protect the environment and to promote sustainable development, the preservation of biological diversity and environmental education. Under Bolivia's environmental regulations, environmental impact assessments are required, and concession holders must maintain waterways running through their concessions in their unspoiled state, employ exploration and development techniques that minimize environmental damage and minimize damage to surface rights, to neighboring concessions and to the environment.
10
Bolivia has experienced high levels of unemployment and underemployment. Bolivia has a large pool of unskilled and, in the mining sector, semi-skilled labor, but a relative shortage of skilled labor and managerial expertise overall. A large portion of the labor force that is engaged in wage employment is also unionized, although union participation is not mandatory and collective bargaining agreements are very rare, as negotiations are generally carried out between an individual company's union and management.
EXPLORATION
In adition to San Cristóbal, we have a portfolio of properties in Bolivia, Mexico and Peru totaling approximately 583,000 acres which contain potential for silver mineralization or other significant exploration potential. These mineral properties typically consist of:
We generally seek to structure our acquisitions of mineral rights so that individual properties can be optioned for exploration and subsequently acquired at reasonable cost if justified by exploration results. Properties which we determine do not warrant further exploration or development expenditures are divested, typically without further financial obligation to us. Although we believe that our exploration properties may contain significant silver and/or other mineralization, our analysis of most of these properties is at a preliminary stage and some or all of the properties may not advance to a development stage. The activities performed to date at these properties often have involved the analysis of data from previous exploration efforts by others, supplemented by our own exploration programs.
Our exploration holdings consist primarily of ownership interests, leases, options and joint ventures, all in varying percentages. The distribution of these holdings is summarized in the table below. Acreage amounts shown below represent a 100% interest.
Location and Distribution of Exploration Properties
Country |
Number of Exploration Property Groups |
Acreage |
||||
---|---|---|---|---|---|---|
Mexico | 6 | 110,900 | ||||
South America | ||||||
Bolivia | 15 | 320,400 | ||||
Peru | 26 | 151,700 | ||||
Total | 47 | 583,000 | ||||
We have holdings in Mexico in the historic Zacatecas mining district as well as several other silver-gold properties in the States of Guerrero, Durango and Zacatecas. We continue to evaluate projects for acquisition and exploration and plan to initiate drill testing of our more promising projects during 2005.
We also have holdings, joint ventures and options in Bolivia, other than the San Cristóbal Project and maintain an exploration office in La Paz, Bolivia that is responsible for project generation and evaluation in Bolivia and Argentina. We also have an exploration office in Lima, Peru and are actively exploring for silver in Peru, the world's second largest silver producing country. We have acquired the mineral rights to several historic silver districts in the northeastern and southeastern parts of the country. We plan to drill several of our more promising projects in 2005.
We have relinquished our holdings in central Asia after our evaluation indicated that the projects would not meet our requirements.
11
Investors in Apex Silver should consider carefully, in addition to the other information contained in, or incorporated by reference into, this report, the following risk factors:
We have identified a material weakness in our internal controls over financial reporting.
Section 404 of the Sarbanes-Oxley Act of 2002 requires management to make an assessment of the design and operating effectiveness of our internal controls and our auditors to audit the design and operating effectiveness of our internal controls as well as forming an opinion on management's assessment. As of December 31, 2004, we had a material weakness in our internal controls because we lacked a sufficent complement of personnel with a level of accounting expertise that is commensurate with our financial reporting requirements. This material weakness resulted in certain adjustments to our financial statements.
We have retained the public accounting firm currently assisting in our Section 404 compliance effort to assist us in preparing our financial statements and to provide technical expertise in the proper application of generally accepted accounting principles to various transactions and other financial statement matters. We have hired additional personnel and continue to evaluate the need for additional personnel for our accounting department, including personnel with technical expertise in the application of generally accepted accounting principles. However, we have not yet been able to test and assess the operating effectiveness of our internal controls, including these mitigating steps, surrounding the financial reporting process, and testing may reveal similar or additional weaknesses in the design and effectiveness related to the financial reporting process. Since this material weakness was not effectively remediated, management has concluded that Apex Silver's controls are ineffective. Further, our independent registered public accounting firm has issued an adverse opinion on our internal controls as of December 31, 2004. Because opinions on internal controls have not been issued in the past, it is uncertain what impact an adverse opinion would have on our company or our stock price.
We have no history of production.
We have no history of producing silver or other metals. The development of our San Cristóbal Project will require the construction or rehabilitation and operation of mines, processing plants and related infrastructure. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises. There can be no assurance that we will successfully establish mining operations or profitably produce silver or other metals at any of our properties.
12
We have a history of losses and we expect losses to continue for at least the next three years.
As an exploration and development company that has no production history, we have incurred losses since our inception, and we expect to continue to incur additional losses for at least the next three years. As of December 31, 2004, we had an accumulated deficit of $97.7 million. There can be no assurance that we will achieve or sustain profitability in the future.
The calculation of our reserves and other mineralization is subject to significant estimates.
Unless otherwise indicated, reserves and other mineralization figures presented in our filings with the SEC, press releases and other public statements that may be made from time to time are based on estimates of contained silver and other metals made by independent geologists or our own personnel. These estimates are imprecise and depend on geological interpretation and statistical inferences drawn from drilling and sampling which may prove to be unreliable. There can be no assurance that:
Since we have not commenced production on any of our properties, reserves and other mineralization estimates may require adjustments or downward revisions based on actual production experience. Extended declines in market prices for silver, zinc and lead may render portions of our reserves uneconomic and result in reduced reported reserves. Any material reductions in estimates of our reserves and other mineralization, or of our ability to extract these reserves or mineralization, could have a material adverse effect on our results of operations, financial condition and cash flows.
We have not established the presence of any proven or probable reserves at any of our mineral properties other than the San Cristóbal project. There can be no assurance that subsequent testing or future feasibility studies will establish additional reserves at our properties. The failure to establish additional reserves could restrict our ability to successfully implement our strategies for long term growth beyond the San Cristóbal project.
The San Cristóbal Project is subject to risks including delays in completion and we may be unable to achieve anticipated production volume or manage cost increases.
Completion of the development of the San Cristóbal Project is subject to various factors, including the availability, terms, conditions and timing of acceptable arrangements for financing, transportation, construction, and smelting; required government approvals and the performance of our engineering and construction contractors, mining contractor, suppliers and consultants. The lack of availability on acceptable terms or the delay in any one or more of the other items listed above could also delay or prevent the development of San Cristóbal as currently planned. Further, completion of the development of the San Cristóbal Project may be compromised in the event of a prolonged decline in price levels for silver and zinc. There can be no assurance:
We have never developed or operated a mine or managed a significant mine development project. We cannot assure you that the development of San Cristóbal will be completed at the cost and on the schedule predicted, or that silver, zinc and lead grades and recoveries, production rates or anticipated capital or operating costs will be achieved.
13
If the actual cost to complete the development of the San Cristóbal Project is significantly higher than currently expected, there can be no assurance that we will have enough funds to cover these costs or that we would be able to obtain alternative sources of financing to cover these costs. Unexpected cost increases, reduced silver and zinc prices or the failure to obtain necessary project financing on acceptable terms to commence or complete the development of the San Cristóbal Project on a timely basis, or to achieve anticipated production capacity, could have a material adverse effect on our future results of operations, financial condition and cash flows.
The successful development of the San Cristóbal Project is also subject to the other risk factors described herein.
We depend on a single mining project.
We anticipate that the majority, if not all, of any revenues for the next few years and beyond will be derived from the sale of metals mined at the San Cristóbal project. Therefore, if we are unable to complete and successfully mine the San Cristóbal project, our ability to generate revenue and profits would be materially adversely affected.
Our success will depend on our ability to manage our growth.
As we increase our development activity at San Cristóbal, we are experiencing significant growth in our operations, which we expect to continue and accelerate over the next several years now that construction has commenced and we anticipate the commencement of production in 2007. This growth has created and will continue to create new positions and responsibilities for management personnel and will substantially increase demands on our operating and financial systems. There can be no assurance that we will successfully meet these demands and manage our anticipated growth.
Our profitability will be affected by changes in the prices of metals.
Our profitability and long-term viability depend, in large part, on the market price of silver, zinc, lead and other metals. The market prices for these metals are volatile and are affected by numerous factors beyond our control, including:
The aggregate effect of these factors on metals prices is impossible for us to predict. Decreases in metals prices have delayed, and could in the future adversely affect, our ability to finance the development of the San Cristóbal Project and the exploration and development of our other properties, which would have a material adverse effect on our financial condition and results of operations, cash flows. There can be no assurance that metals prices will not decline.
14
The following table sets forth for the periods indicated (1) the Comex nearby active silver futures contract's high and low price of silver in U.S. dollars per troy ounce and (2) the London Metals Exchange's high and low settlement prices of zinc and lead in U.S. dollars per pound.
|
Silver |
Zinc |
Lead |
|||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Year |
||||||||||||
High |
Low |
High |
Low |
High |
Low |
|||||||
2000 | 5.57 | 4.62 | 0.58 | 0.46 | 0.26 | 0.18 | ||||||
2001 | 4.83 | 4.03 | 0.48 | 0.33 | 0.24 | 0.20 | ||||||
2002 | 5.13 | 4.22 | 0.42 | 0.33 | 0.24 | 0.18 | ||||||
2003 | 5.99 | 4.35 | 0.46 | 0.34 | 0.34 | 0.19 | ||||||
2004 | 8.29 | 5.49 | 0.56 | 0.42 | 0.45 | 0.29 | ||||||
2005* | 7.57 | 6.41 | 0.65 | 0.54 | 0.45 | 0.39 |
The closing prices of silver, zinc and lead on March 10, 2005 were $7.48 per troy ounce, $0.65 per pound and $0.44 per pound, respectively.
We may not be successful in hedging against price, currency and interest rate fluctuations and may incur mark to market losses and lose money through our hedging programs.
We have engaged in limited metals trading activities to hedge against commodity and base metals price risks, using puts and calls. We are in the process of securing additional project debt financing for the San Cristóbal Project and in connection with that financing we will be required to utilize various price hedging techniques to hedge a limited amount of the metals we produce at San Cristóbal. The level of hedging we are required to maintain in the future will be determined based on negotiations with our lenders.
We may also engage in activities to hedge the risk of exposure to currency and interest rate fluctuations related to the development of the San Cristóbal Project in Bolivia or to exploration or development in other countries in which we incur substantial expenditures. Further, terms of our financing arrangements may require us to hedge against these risks.
There can be no assurance that we will be able to successfully hedge against price, currency and interest rate fluctuations. In addition, our ability to hedge against zinc and lead price risk in a timely manner may be adversely affected by the smaller volume of transactions in both the zinc and lead markets. Further, there can be no assurance that the use of hedging techniques will always be to our benefit. Hedging instruments that protect against market price volatility may prevent us from realizing the benefit from subsequent increases in market prices with respect to covered production, which would limit our revenues and profits. Hedging contracts also are subject to the risk that the other party may be unable or unwilling to perform its obligations under these contracts. Any significant nonperformance could have a material adverse effect on our financial condition, results of operations and cash flows.
The exploration of mineral properties is highly speculative in nature, involves substantial expenditures and is frequently non-productive.
Our future growth and profitability will depend, in part, on our ability to identify and acquire additional mineral rights, and on the costs and results of our continued exploration and development programs. Competition for attractive mineral exploration properties is intense. Our strategy is to expand our reserves through a broad program of exploration. Mineral exploration is highly speculative in nature and is frequently non-productive. Substantial expenditures are required to:
15
If we discover ore, it usually takes several years from the initial phases of exploration until production is possible. During this time, the economic feasibility of production may change. As a result of these uncertainties, there can be no assurance that we will successfully acquire additional mineral rights, or that our exploration programs will result in new proven and probable reserves in sufficient quantities to justify commercial operations in any of our properties, other than the San Cristóbal project.
We consider from time to time the acquisition of operating or formerly operating mines. Our decisions to acquire these properties are based on a variety of factors including historical operating results, estimates of and assumptions about future reserves, cash and other operating costs, metals prices and projected economic returns, and evaluations of existing or potential liabilities associated with the property and its operation. Other than historical operating results, all of these may differ significantly from our estimates and assumptions. In addition, there is intense competition for attractive properties. Accordingly, there is no assurance that our acquisition efforts will result in profitable mining operations.
Our profitability depends, in part, on actual economic returns and actual costs of developing mines, which may differ significantly from our estimates and involve unexpected problems and delays.
None of our mineral properties, including the San Cristóbal project, has an operating history upon which we can base estimates of future cash operating costs. Our decision to develop the San Cristóbal Project is based on feasibility studies. Decisions about the development of other projects in the future may also be based on feasibility studies. Feasibility studies derive estimates of reserves and operating costs and project economic returns. Estimates of economic returns are based, in part, on assumptions about future metals prices. Our profitability will be affected by changes in the price of metals. Feasibility studies derive estimates of average cash operating costs based upon, among other things:
Actual cash operating costs, production and economic returns may differ significantly from those anticipated by our studies and estimates.
There are a number of uncertainties inherent in the development and construction of any new mine, including the San Cristóbal project. These uncertainties include:
The costs, timing and complexities of mine construction and development are increased by the remote location of many mining properties, like the San Cristóbal project. It is common in new mining operations to experience unexpected problems and delays during development, construction and mine start-up. In
16
addition, delays in the commencement of mineral production often occur. Accordingly, there is no assurance that our future development activities will result in profitable mining operations.
Title to our mineral properties may be challenged.
Our policy is to seek to confirm the validity of our rights to title to, or contract rights with respect to, each mineral property in which we have a material interest. However, we cannot guarantee that title to our properties will not be challenged. Title insurance generally is not available, and our ability to ensure that we have obtained secure claim to individual mineral properties or mining concessions may be severely constrained. We have not conducted surveys of all of the claims in which we hold direct or indirect interests and, therefore, the precise area and location of these claims may be in doubt. Accordingly, our mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. In addition, we may be unable to operate our properties as permitted or to enforce our rights with respect to our properties.
We may lose rights to properties if we fail to meet payment requirements or development or production schedules.
We derive the rights to some of our mineral properties, including some of our principal properties at the San Cristóbal project, from leaseholds or purchase option agreements which require the payment of rent or other installment fees. In addition, we must make annual mining patent payments to the Bolivian government totaling approximately $360,000 to maintain our concessions at San Cristóbal. If we fail to make these payments when they are due, our rights to the property may lapse. There can be no assurance that we will always make payments by the requisite payment dates. Some contracts with respect to our mineral properties require development or production schedules. There can be no assurance that we will be able to meet any or all of the development or production schedules. In addition, our ability to transfer or sell our rights to some of our mineral properties requires governmental approvals or third party consents, which may not be granted.
We cannot insure against all of the risks associated with mining.
The business of mining is subject to a number of risks and hazards, including:
These risks can result in, among other things:
17
Although we maintain, and intend to continue to maintain, insurance with respect to our operations and mineral properties within ranges of coverage consistent with industry practice, there can be no assurance that insurance will be available at economically feasible premiums. Insurance against environmental risks is not generally available. These environmental risks include potential liability for pollution or other disturbances resulting from mining exploration and production. In addition, not all risks associated with developing and producing silver, zinc, lead and other metals are included in coverage and some covered risks may result in liabilities which exceed policy limits. Further, we may elect to not seek coverage for all risks. The occurrence of an event that is not fully covered, or covered at all, by insurance, could have a material adverse effect on our financial condition, results of operations and cash flows.
Our San Cristóbal Project and our exploration activities are in countries with developing economies and are subject to the risks of political and economic instability associated with these countries.
We currently conduct exploration activities in countries with developing economies including Bolivia, Mexico and Peru in Latin America. These countries and other emerging markets in which we may conduct operations have from time to time experienced economic or political instability. We may be materially adversely affected by risks associated with conducting operations in countries with developing economies, including:
Bolivia has experienced slow economic growth and political instability in the last three years. In late 2003, there were violent demonstrations in La Paz and elsewhere in Bolivia, protesting, among other things, the proposed export of natural gas to the U.S. through Chile. These demonstrations resulted in the resignation of President Sanchez de Lozada in October 2003, and his constitutional replacement by President Mesa. Demonstrations have continued in 2004 and early 2005, focused on, among other things, the opposition of certain political parties to a proposed statute regulating oil and gas development in Bolivia. As proposed, the new law would provide incentives for foreign investment and increase taxes and royalties on oil and gas production. Following a period of demonstrations, President Mesa resigned in early March 2005. The Bolivian Congress rejected his resignation, and President Mesa has agreed to continue to serve as President based on agreements regarding passage of a new oil and gas statute and progress on certain other initiatives. The remaining opposing political party continues its active opposition. To date, there have been no formal proposals to impose royalties or increase taxes on the mining industry. Although to date these conditions and events have not caused any adverse impact on our San Cristóbal project, political and economic uncertainties and instability continue and may not be resolved successfully. The political and economic climate may become more unstable, and political and economic uncertainties may in the future have an adverse impact on the development or operations of San Cristóbal.
Changes in mining or investment policies or shifts in the prevailing political climate in any of the countries in which we conduct exploration and development activities could adversely affect our business.
18
Our operations may be affected in varying degrees by government regulations with respect to, among other things:
We cannot accurately predict the effect of these factors. In addition, legislation in the United States regulating foreign trade, investment and taxation could have a material adverse effect on our financial condition, results of operations and cash flows.
Our activities are subject to foreign environmental laws and regulations which may materially adversely affect our future operations.
We conduct mineral exploration and development activities primarily in Central America and South America, and are most active in Bolivia, where the San Cristóbal Project is located, and Mexico. With the development of San Cristóbal, we also expect to conduct mining operations in Bolivia. These countries have laws and regulations which control the exploration and mining of mineral properties and their effects on the environment, including air and water quality, mine reclamation, waste handling and disposal, the protection of different species of flora and fauna and the preservation of lands. These laws and regulations will require us to acquire permits and other authorizations for certain activities. In many countries, including Bolivia, there is relatively new comprehensive environmental legislation, and the permitting and authorization processes may be less established and less predictable than they are in the United States. There can be no assurance that we will be able to acquire necessary permits or authorizations on a timely basis, if at all. Delays in acquiring any permit or authorization could increase the development cost of San Cristóbal or other projects and could delay the commencement of production.
Environmental legislation in many countries is evolving in a manner which will likely require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. In Bolivia, where there is relatively new environmental legislation, enforcement activities and strategies may be under development, and thus may be less predictable than in the United States. We cannot predict what environmental legislation or regulations will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted. Compliance with more stringent laws and regulations, as well as potentially more vigorous enforcement
19
policies or regulatory agencies or stricter interpretation of existing laws, may (1) necessitate significant capital outlays, (2) cause us to delay, terminate or otherwise change our intended activities with respect to one or more projects and (3) materially adversely affect our future operations.
Many of our exploration and development properties are located in historic mining districts where prior owners may have caused environmental damage which may not be known to us or to the regulators. In most cases, we have not sought complete environmental analyses of our mineral properties and have not conducted comprehensive reviews of the environmental laws and regulations in every jurisdiction in which we own or control mineral properties. To the extent we are subject to environmental requirements or liabilities, the cost of compliance with these requirements and satisfaction of these liabilities would reduce our net cash flow and could have a material adverse effect on our financial condition and results of operations. If we are unable to fund fully the cost of remediation of any environmental condition, we may be required to suspend operations or enter into interim compliance measures pending completion of the required remediation.
We compete against larger and more experienced companies.
The mining industry is intensely competitive. Many of the largest mining companies are primarily producers of base metals, and may become interested in the types of silver deposits on which we are focused because these deposits typically are polymetallic, containing significant quantities of base metals including zinc, lead and copper. Many of these companies have greater financial resources, operational experience and technical capabilities than we have. We may encounter increasing competition from other mining companies in our efforts to acquire mineral properties and hire experienced mining professionals. Increased competition in our business could adversely affect our ability to attract necessary capital funding or acquire suitable producing properties or prospects for mineral exploration in the future.
Our ability to obtain dividends or other distributions from our subsidiaries may be subject to restrictions imposed by law, foreign currency exchange regulations and our financing arrangements.
We conduct, and will continue to conduct, all of our operations through subsidiaries. Our ability to obtain dividends or other distributions from our subsidiaries may be subject to restrictions on dividends or repatriation of earnings under applicable local law, monetary transfer restrictions and foreign currency exchange regulations in the jurisdictions in which the subsidiaries operate. Further, our anticipated financing for the San Cristóbal is expected to include requirements that we satisfy certain debt service reserve or operating reserve requirements or meet debt payment obligations prior to payment to us of any dividends by our subsidiaries. Our subsidiaries' ability to pay dividends or make other distributions to us is also subject to their having sufficient funds to do so. If our subsidiaries are unable to pay dividends or make other distributions, our growth may be inhibited unless we are able to obtain additional debt or equity financing on acceptable terms. In the event of a subsidiary's liquidation, we may lose all or a portion of our investment in that subsidiary.
We may not be able to raise the funds necessary to explore and develop our mineral properties.
Although we raised approximately $536.7 million through equity sales and proceeds from the sale of notes in 2004, we will need additional external financing to develop and construct the San Cristóbal Project and to fund the exploration and development of our other mineral properties. Sources of external financing may include bank borrowings and future debt and equity offerings. There can be no assurance that financing will be available on acceptable terms, or at all. The failure to obtain financing would have a material adverse effect on our growth strategy and our results of operations and financial condition. The mineral properties that we are likely to develop are expected to require significant capital expenditures. There can be no assurance that we will be able to secure the financing necessary to retain our rights to, or to begin or sustain production at, our mineral properties.
20
We depend on the services of key executives.
We are dependent on the services of key executives including our executive chairman and chief executive officer and a small number of highly skilled and experienced executives and personnel focused on the development of the San Cristóbal project. Due to the relatively small size of Apex Silver, the loss of these persons or our inability to attract and retain additional highly skilled employees required for the development of the San Cristóbal Project may delay or otherwise adversely affect the development of the San Cristóbal project, which could have a material adverse effect on our business or future operations.
The substantial control of Apex Silver by our directors, officers and 5% shareholders may have a significant effect in delaying, deferring or preventing a change in control of Apex Silver or other events which could be of benefit to our other shareholders.
As of March 10, 2005, the directors of Apex Silver and officers of Apex Silver Mines Corporation, together with members of their families and entities that may be deemed to be affiliates of or related to these persons or entities, and 5% shareholders beneficially owned approximately 28.4 million, or 60%, of our outstanding shares, assuming the conversion of currently exercisable options and warrants. This level of ownership by these persons may have a significant effect in delaying, deferring or preventing a change in control of Apex Silver or other events which could be of benefit to our other shareholders.
Apex Silver and certain lower tier subsidiaries may be treated as passive foreign investment companies for U.S. federal income tax purposes.
We believe that we likely were a passive foreign investment company ("PFIC") with respect to 2004, and likely will be a PFIC in 2005 as well as potentially with respect to future years. If we are a PFIC, U.S. holders of Ordinary Shares and warrants to acquire Ordinary Shares will be subject to certain adverse U.S. federal income tax rules. Under the PFIC rules, a U.S. holder who disposes or is deemed to dispose of Ordinary Shares or warrants at a gain, or who receives or is deemed to receive certain distributions with respect to Ordinary Shares, generally will be required to treat such gain or distributions as ordinary income and pay an interest charge on the tax imposed with respect thereto. Certain elections may sometimes be used to reduce the adverse impact of the PFIC Rules for holders of Ordinary Shares(so-called "QEF elections" and "mark-to-market" elections), but these elections may accelerate the recognition of taxable income and may result in the recognition of ordinary income. In addition, elections that may be used to reduce the adverse impact of the PFIC rules will not be available with respect to warrants to acquire Ordinary Shares. The PFIC rules are extremely complex, and prospective investors are urged to consult their own tax advisers regarding the potential consequences to them of Apex Silver being classified as a PFIC.
We have in certain prior filings stated that we believed that (i) Apex Silver may be considered a PFIC but (ii) none of our non-U.S. lower tier subsidiaries was a corporation for U.S. tax purposes that would itself be considered to be a PFIC. We now believe that certain of our non-U.S. lower tier subsidiaries, including the subsidiary that contains the principal assets associated with the San Cristóbal project, were corporations for U.S. tax purposes that constituted PFICs in certain prior years. As a result, there is a possibility that some shareholders may suffer adverse U.S. federal income tax consequences that arguably might not have been suffered had they been aware of the PFIC status of these lower tier subsidiaries. Such shareholders may, however, be able to make retroactive elections in some cases that would mitigate any such adverse consequences. Moreover, under applicable proposed regulations, the fact that our lower tier subsidiaries of any consequence may not have had earnings and profits for any taxable year since formation may arguably eliminate any such tax consequences in respect of prior taxable years. For the current and all subsequent taxable years, we believe that the potential for our lower tier subsidiaries to be classified as PFICs with respect to new investors can be substantially eliminated without adverse tax consequences.
21
In the future, holders of our shares may claim that they have suffered adverse tax consequences for which they could have taken remedial action if they had been aware that such subsidiaries constituted PFICs. It is not possible for us to determine the number of shareholders, if any, that might make such a claim or to determine the merits or impact of such claims on us and whether such claims may be material to us.
METALS MARKET OVERVIEW
Silver Market
Silver has traditionally served as a medium of exchange, much like gold. Silver's strength, malleability, ductility, thermal and electrical conductivity, sensitivity to light and ability to endure extreme changes in temperature combine to make silver a widely used industrial metal. While silver continues to be used as a form of investment and a financial asset, the principal uses of silver are industrial, primarily in electrical and electronic components, photography, jewelry, silverware, batteries, computer chips, electrical contacts, and high technology printing. Silver's anti-bacterial properties also make it valuable for use in medicine and in water purification. Additionally, new uses of silver are being developed in connection with the use of superconductive wire.
Most silver production is obtained from mining operations in which silver is not the principal or primary product. Approximately 80% of mined silver is produced as a by-product of mining lead, zinc, gold, nickel or copper deposits. The CPM Group estimates that total silver supply from mine production, recycling, estimated dishoarding and government stockpile sales has been insufficient to meet industrial demand since 1990, and that stockpiles are continuing to diminish.
The following table sets forth for the periods indicated the Comex nearby active silver futures contract's high and low price of silver in U.S. dollars per troy ounce. On March 10, 2005 the closing price of silver was $7.48 per troy ounce.
|
Silver |
|||
---|---|---|---|---|
Year |
||||
High |
Low |
|||
2000 | 5.57 | 4.62 | ||
2001 | 4.83 | 4.03 | ||
2002 | 5.13 | 4.22 | ||
2003 | 5.99 | 4.35 | ||
2004 | 8.29 | 5.49 |
Zinc and Lead Markets
We expect production from San Cristóbal to include the extraction, processing and sale of significant quantities of zinc and lead contained in sulfide concentrates. Our future projects may also involve the production of economically significant quantities of metals other than silver.
Due to the corrosion resisting property of zinc, zinc is used primarily as the coating in galvanized steel. Galvanized steel is widely used in construction of infrastructure, housing and office buildings. In the automotive industry, zinc is used for galvanizing and die-casting, and in the vulcanization of tires. Smaller quantities of various forms of zinc are used in the chemical and pharmaceutical industries, including fertilizers, food supplements and cosmetics, and in specialty electronic applications such as satellite receivers.
The primary use of lead is in motor vehicle batteries, but it is also used in cable sheathing, shot for ammunition and alloying. Lead in chemical form is used in alloys, glass and plastics. Lead is widely recycled, with secondary production accounting in recent years for approximately 50% to 52% of total supply.
22
The following table sets forth for the periods indicated the London Metals Exchange's high and low settlement prices of zinc and lead in U.S. dollars per pound. On March 10, 2005 the closing prices of zinc and lead were $0.65 and $0.44 per pound, respectively.
|
Zinc |
Lead |
||||||
---|---|---|---|---|---|---|---|---|
Year |
||||||||
High |
Low |
High |
Low |
|||||
2000 | 0.58 | 0.46 | 0.26 | 0.18 | ||||
2001 | 0.48 | 0.33 | 0.24 | 0.20 | ||||
2002 | 0.42 | 0.33 | 0.24 | 0.18 | ||||
2003 | 0.46 | 0.34 | 0.34 | 0.19 | ||||
2004 | 0.56 | 0.42 | 0.45 | 0.29 |
EXECUTIVE OFFICERS OF APEX
Apex Silver has three executive officers. We have entered into a Management Services Agreement pursuant to which we have engaged Apex Silver Mines Corporation, our wholly owned subsidiary, referred to as Apex Corporation, to provide a broad range of corporate management and advisory services. Set forth below are certain personnel of Apex Silver and its subsidiaries.
Name |
Age |
Position |
||
---|---|---|---|---|
Jeffrey G. Clevenger | 55 | President and Chief Executive Officer, Apex Silver | ||
Alan R. Edwards | 47 | Executive Vice President and Chief Operating Officer, Apex Silver | ||
Jerry W. Danni | 52 | Senior Vice President, Environment, Health and Safety, Apex Silver | ||
Marcel F. DeGuire | 55 | Senior Vice President, Marketing and Projects, Apex Silver | ||
Mark A. Lettes | 55 | Senior Vice President and Chief Financial Officer, Apex Silver | ||
Robert B. Blakestad | 58 | Vice President, Exploration, Apex Silver | ||
Igor Levental | 49 | Vice President, Investor Relations and Corporate Development, Apex Corporation | ||
Michael F. Shaw | 58 | Vice President, Project Manager, San Cristóbal, Apex Corporation | ||
Carlos H. Fernandez Mazzi | 46 | President and Chief Executive Officer, Andean Silver Corporation LDC |
Jeffrey G. Clevenger. Mr. Clevenger was elected to serve as a director and as our President and Chief Executive Officer effective October 11, 2004. Mr. Clevenger has worked as an independent consultant since 1999, when Cyprus Amax Minerals Company, his previous employer, was sold. Mr. Clevenger served as Senior Vice President and Executive Vice President of Cyprus Amax Minerals Company from 1993 to 1998 and 1998 to 1999, respectively, and as President of Cyprus Climax Metals Company and its predecessor, Cyprus Copper Company, a large integrated producer of copper and molybdenum with operations in North and South America, from 1993 to 1999. He was Senior Vice President of Cyprus Copper Company from August 1992 to January 1993. From 1973 to 1992, Mr. Clevenger held various technical, management and executive positions at Phelps Dodge Corporation, including President and General Manager of Phelps Dodge Morenci, Inc. Mr. Clevenger holds a B.S. in Mining Engineering with Honors from the New Mexico Institute of Mining and Technology and is a graduate from the Advanced International Senior Management Program of Harvard University. He is a Member of the American Institute of Mining, Metallurgical and Petroleum Engineers.
Alan R. Edwards. On June 14, 2004, we appointed Mr. Edwards to the position of Executive Vice President and Chief Operating Officer. From July 2003 until he joined us, Mr. Edwards served first as Vice President, Technical Services and Project Development and then as Vice President Operations of Kinross Gold Corporation. From March 2002 through June 2003, he pursued independent business interests. From April 2000 through February 2002, Mr. Edwards served first as Vice President, Surface Mines, and then as
23
Senior Vice President, Operations of P.T. Freeport Indonesia. Mr. Edwards was Vice President and General Manager and then President and General Manager of the Cyprus Amax Minerals Company subsidiary which owned and operated the Cerro Verde open pit copper mine in Peru from 1998 through 2000, and served from 1996 until 1998 as Vice President and General Manager of the Cyprus subsidiary which owned and operated the Sierrita copper mine in Arizona. Prior to joining Cyprus in 1996, Mr. Edwards spent 13 years in various positions at Phelps Dodge Corporation, including General Manager Operations at Chino Mines Company and Mine Superintendent at Phelps Dodge Morenci, Inc. Edwards holds a B.S. in Mining Engineering and a MBA from the University of Arizona.
Jerry W. Danni: Mr. Danni joined Apex Silver in February 2005 as the Senior Vice President, Environment, Health and Safety. Prior to joining Apex Silver, Mr. Danni worked for Kinross Gold Corporation as Senior Vice President, Environment Health and Safety from January 2003 until February 2005 and as Vice President, Environmental Affairs from July 2000 until January 2003. While at Kinross he was instrumental in the design and implementation of integrated environmental, and health and safety (EHS) systems and processes for Kinross operations worldwide, and was also responsible for management of the Reclamation Operations Business Unit. From 1994 to July 2000, Mr. Danni was the Vice President of Environmental Affairs for Cyprus Climax Metals Company. Prior to working for Cyprus, Mr. Danni held senior environmental, and health and safety management positions with Lac Minerals Ltd. and Homestake Mining Company. Mr. Danni holds a B.S. Degree in Chemistry from Western State College, and is a member of the Society of Mining Engineers and a past director of the National Mining Association.
Marcel F. DeGuire. Mr. DeGuire serves as Senior Vice President, Marketing and Projects, of Apex Silver. Prior to joining Apex Silver in August 1996, he served as Newmont Mining Corporation's Vice President of Project Development and Country Manager for those jurisdictions which were formerly part of the Soviet Union for Newmont Gold Company. He acted as Project Leader for feasibility studies and development and startup of the $225 million Muruntau large scale open pit heap leach gold project in Uzbekistan. Mr. DeGuire was directly involved in the joint venture negotiations leading up to the project, the subsequent feasibility studies, completion of construction and the commencement of mining operations. Mr. DeGuire was also responsible for various feasibility analyses of Newmont's Yanacocha gold project in Peru. During his almost 20 years with Newmont, Mr. DeGuire worked as resident manager of a uranium mine and became a leading expert in environmental management and mine reclamation, serving as Newmont's Vice President of Environmental Affairs and Research and Development as well as in other senior executive positions. Mr. DeGuire is a member of the American Institute of Mining, Mettalurgical and Petroleum Engineers, the Canadian Institute of Metallurgy and the Mining and Metallurgical Society of America and has published various articles on mineral processing and environmental matters. Mr. DeGuire holds a B.S. in metallurgical engineering from Michigan Technological University and an M.S. in metallurgical engineering from the University of Nevada, Reno.
Mark A. Lettes. Mr. Lettes has served as Vice President, Finance and Chief Financial Officer of Apex Corporation since June 1998, and was elected as Apex Silver's Chief Financial Officer in 2002. Prior to joining Apex Corporation, Mr. Lettes served from late 1996 to 1998 as Vice President Trading for Amax Gold Inc. and Director of Treasury for Cyprus Amax Minerals Company, where he was responsible for all Amax Gold hedging activities. A financial professional with over 25 years experience, Mr. Lettes served as Vice President and Chief Financial Officer for Amax Gold from 1994 until 1996 where he was responsible for numerous financings including project financings for the Fort Knox mine in Alaska and the Refugio mine in Chile, parent-subsidiary financing arrangements with Cyprus Amax and a convertible preferred issue. Mr. Lettes started the gold hedging program at Amax Gold and was responsible for all hedging activities of Amax Gold from 1987 through June 1998, when Amax Gold merged with Kinross Gold Corporation. From 1979 through 1986, Mr. Lettes held several positions at AMAX Inc. in which he was responsible for certain planning, economic analysis, business development and acquisition activities. Transactions on which Mr. Lettes worked at AMAX included the acquisition of the remaining 50% of
24
Alumax, AMAX's aluminum subsidiary. Prior to his service at AMAX and Amax Gold, Mr. Lettes held professional positions in the financial departments of United Technologies and Rockwell International from 1974 until 1979. Mr. Lettes holds a B.S. in marketing from the University of Connecticut and an M.B.A. from Ohio State University.
Robert B. Blakestad. In November 2004, Mr. Blakestad was appointed as Vice President, Exploration of Apex Silver. Prior to joining Apex Silver, Mr. Blakestad served as Chief Executive Officer of International Taurus Resources from May 1998 until November 2004. He was Vice PresidentExploration for Amax Gold from 1996 to 1998 and Exploration Manager for Cyprus Amax Minerals Company from 1990 until 1996. He held various positions at Homestake Mining Company from 1979 until 1990, beginning as a Senior Geologist and rising to the position of Manager, U.S. Reconnaissance. Mr. Blakestad holds a B.S. in Mining Engineering from the New Mexico Institute of Mining and Technology and an M.S. in Geology from the University of Colorado. He holds professional certifications from the State of Washington and the Province of Nova Scotia.
Igor Levental. Mr. Levental has served as the Vice President, Investor Relations and Corporate Development of Apex Corporation since January 2003. From September 2002 until joining Apex Corporation, Mr. Levental was an independent consultant. Mr. Levental served as Director of Corporate Communications for Dicon Fiberoptics, Inc. from March 2002 through September 2002, where he was responsible for marketing and promoting Dicon in advance of Dicon's intitial public offering. From 1992 to 2002, Mr. Levental served as Homestake Mining Company's Vice President of Investor Relations where he was responsible for the design and implementation of Homestake's investor relations strategy. Mr. Levental served as Manager, Corporate Development for Homestake from 1994 to 1999. As a member of Homestake's Corporate Development team, Mr. Levental assisted in various corporate development transactions totalling over $1 billion. From 1992 to 1994, Mr. Levental was a Senior Consultant for Homestake. From 1989 to 1992, Mr. Levental served as Vice President, Investments and Investor Relations at International Corona Corporation, which was acquired by Homestake in 1992. In total, Mr. Levental has 23 years of experience in investor relations and corporate development. Mr. Levental earned a B.S. in chemical engineering and an M.B.A. from the University of Alberta, Canada. He is a registered professional engineer in the province of Ontario and is a member of the National Investor Relations Institute.
Michael F. Shaw. Mr. Shaw has served as Vice President of Apex Corporation since May 2000 and as Project Manager for the San Cristóbal Project since January 1999. Prior to joining Apex Corporation, Mr. Shaw served from 1996 through 1998 as Vice President of Tiomin Resources and as Vice President, General Manager and a director of Panama Cobre, S.A., a subsidiary of Tiomin. At Tiomin, he was responsible for development activity at the Cerro Colorado copper deposit in Panama. Mr. Shaw served from 1994 to 1996 as Project Director for Cyprus Amax Minerals Company on the solvent extraction-electrowinning expansion of its Cerro Verde copper mine in Peru, which was completed on schedule and under budget. In addition, Mr. Shaw has held numerous project management positions for Bechtel Corporation and Kvaerner Metals (Davy McKee). Over the course of his career, he helped build the Andacollo gold mine in Chile, the El Abra copper mine in Chile, the Jerritt Canyon gold mine in Nevada and Magma Copper Company's flash copper smelter in Arizona. A metallurgical engineer with nearly 30 years experience, Mr. Shaw began his career as a metallurgist for Phelps Dodge Corporation before specializing in project management. He holds a B.S. in chemistry and an M.S. in metallurgical engineering from the University of Texas El Paso.
Carlos H. Fernandez Mazzi. Mr. Fernandez has served as President and Chief Executive Officer of Andean Silver Corporation, our wholly owned subsidiary, since January 2002. From January 1999 through 2001, he served as Executive Vice President and Chief Operating Officer of Andean Silver Corporation. Andean Silver Corporation indirectly owns the San Cristóbal project. Since 1998 he has been a director of the San Cristóbal Foundation, which implements community related investments near the San Cristóbal
25
project. Prior to joining Apex Silver, Mr. Fernandez worked in the financial sector for over 12 years, specializing in investment banking and trade finance. From September 1996 through July 1998, Mr. Fernandez was a founding partner and director of Sudamer Valores S.A., a licensed brokerage firm, and a founding partner and chief executive officer of Innova Capital, a financial advisory and asset management firm, both locatted in La Paz, Bolivia. From 1985 through 1996, he held various positions at BHN Multibanco S.A., including director responsible for new business development, Executive Vice President and Vice President, Operations and Finance. Mr. Fernandez earned a B.S. in industrial and systems engineering from the University of Arkansas and an M.B.A. from the University of Notre Dame.
As of March 10, 2005, we had approximately 115 full-time employees.
Our insider trading policy permits our officers, directors and other insiders to enter into trading plans or arrangements for systematic trading in our securities under Rule 10b5-1 of the Securities Exchange Act of 1934. Certain of our officers previously have established such plans, and we anticipate that some or all of our other officers, directors or insiders may establish trading plans at some date in the future.
Our subsidiary, Apex Corporation, provides management, advisory and administrative services to us under a Management Services Agreement dated October 22, 1996. The services provided by Apex Corporation include:
We pay Apex Corporation a service fee in an amount equal to the direct and indirect costs incurred by Apex Corporation in providing its services, plus 5% of those costs.
We may be subject from time to time to legal claims or proceedings, with or without merit. There are currently no legal claims or proceedings pending against us.
ITEM 4: SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS
No matters were submitted to a vote of security holders in the fourth quarter of 2004.
26
ITEM 5: MARKET FOR REGISTRANT'S COMMON EQUITY AND RELATED SHAREHOLDER MATTERS
Our Ordinary Shares are listed on the American Stock Exchange under the symbol "SIL." As of March 10, 2005, we had approximately 180 shareholders of record and an estimated 12,000 additional beneficial holders whose Ordinary Shares were held in street name by brokerage houses.
We have never paid any dividends on our Ordinary Shares and expect for the foreseeable future to retain all of our earnings from operations for use in expanding and developing our business. Any future decision as to the payment of dividends will be at the discretion of our board of directors and will depend upon our earnings, receipt of dividends from our subsidiaries, financial position, capital requirements, plans for expansion and such other factors as our board of directors deems relevant.
The following table sets forth the high and the low sale prices per share of our Ordinary Shares for the periods indicated. The closing price of the Ordinary Shares on March 10, 2005 was $18.87.
|
2004 |
2003 |
||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Period |
||||||||||||
High |
Low |
High |
Low |
|||||||||
1st Quarter | $ | 24.22 | $ | 19.35 | $ | 16.42 | $ | 12.90 | ||||
2nd Quarter | 22.76 | 15.30 | 15.38 | 12.35 | ||||||||
3rd Quarter | 21.70 | 16.75 | 18.06 | 13.40 | ||||||||
4th Quarter | 21.64 | 16.68 | 21.51 | 12.70 |
27
ITEM 6: SELECTED CONSOLIDATED FINANCIAL DATA
The selected consolidated financial data of Apex Silver for the years ended December 31, 2004, 2003, 2002, 2001, and 2000, and the period from December 22, 1994 (inception) through December 31, 2004, are derived from our audited consolidated financial statements. This table should be read in conjunction with the Consolidated Financial Statements and Management's Discussion and Analysis of Financial Condition and Results of Operations.
|
|
|
|
|
|
For the period from December 22, 1994 Inception through December 31, 2004 |
|||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Year ended December 31, |
||||||||||||||||||||
|
2004 |
2003 |
2002 |
2001 |
2000 |
||||||||||||||||
|
(in thousands except per share) |
||||||||||||||||||||
Statement of Operations: | |||||||||||||||||||||
Operating (expenses) | $ | (5,361 | ) | $ | (2,769 | ) | $ | (3,919 | ) | $ | (3,854 | ) | $ | (4,648 | ) | $ | (69,382 | ) | |||
Other expense net | (13,484 | ) | (3,275 | ) | (4,735 | ) | (4,730 | ) | (3,092 | ) | (32,835 | ) | |||||||||
Net loss before minority interest | (18,845 | ) | (6,044 | ) | (8,654 | ) | (8,584 | ) | (7,740 | ) | (102,217 | ) | |||||||||
Minority interest in consolidated loss | | | | | | 4,559 | |||||||||||||||
Net loss | $ | (18,845 | ) | $ | (6,044 | ) | $ | (8,654 | ) | $ | (8,584 | ) | $ | (7,740 | ) | $ | (97,658 | ) | |||
Comprehensive loss | (18,777 | ) | (6,044 | ) | (8,654 | ) | (8,584 | ) | (7,740 | ) | (97,590 | ) | |||||||||
Net loss per Ordinary Share basic and diluted | $ | (0.41 | ) | $ | (0.17 | ) | $ | (0.24 | ) | $ | (0.25 | ) | $ | (0.22 | ) | ||||||
Weighted average Ordinary Shares outstanding | 46,528 | 36,576 | 35,678 | 34,634 | 34,473 | ||||||||||||||||
Cash Flow Data: | |||||||||||||||||||||
Net cash provided by (used in) financing activites | $ | 536,062 | $ | 3,075 | $ | 11,277 | $ | (148 | ) | $ | (439 | ) | $ | 741,309 | |||||||
Net cash used in operating activities | (9,218 | ) | (3,199 | ) | (3,692 | ) | (7,175 | ) | (7,582 | ) | (82,539 | ) | |||||||||
Net cash used in investing activites | (516,618 | ) | (3,719 | ) | (5,452 | ) | (12,244 | ) | (27,172 | ) | (631,030 | ) | |||||||||
Balance Sheet Data: |
|||||||||||||||||||||
Total assets | $ | 693,818 | $ | 146,167 | $ | 144,055 | $ | 135,898 | $ | 143,715 | |||||||||||
Long term liabilitites | $ | 339,987 | $ | 599 | $ | 770 | $ | 1,630 | $ | 1,896 | |||||||||||
Shareholders' equity | $ | 346,116 | $ | 143,986 | $ | 141,731 | $ | 132,266 | $ | 137,557 |
28
ITEM 7: MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
General
The following discussion and analysis should be read together with the consolidated financial statements of Apex Silver Mines Limited and the selected financial data and related notes thereto included elsewhere in this report on form 10-K.
Apex Silver is a mining exploration and development company that holds a portfolio of silver exploration and development properties primarily in South America and Central America. We currently focus our resources primarily on the development and financing of our San Cristóbal Project in Bolivia. At present, none of our properties is in production and, consequently, we have no current operating income or cash flow.
Overview
During 2004, we completed two share offerings resulting in net proceeds of approximately $208.6 million, after commissions and fees. In March and April of 2004 we completed the issuance of $200 million principal amount of 2.875% Convertible Senior Subordinated Notes due 2024 and in October and December of 2004 we completed the issuance of an additional $140 million principal amount of 4.0% Convertible Senior Subordinated Notes due 2024. The convertible notes offerings resulted in aggregate net proceeds of $328.1 million after commissions. The net proceeds from the share offerings and the convertible notes will be used to finance a portion of the construction and development of our San Cristóbal project, advance evaluation of exploration properties and for other general corporate purposes.
We continue to work with Barclays and BNP Paribas to secure commercial bank debt financing and develop other financing options for San Cristóbal as part of a total financing package that may incorporate support from export credit agencies, multilateral agencies and other public lenders. During 2004, we also filed a universal shelf registration statement on Form S-3 with the Securities and Exchange Commission. The registration statement became effective in August 2004, and allows us to sell up to $200 million in any combination of equity or debt securities as described in the registration statement in one or more offerings.
We have completed updating the San Cristóbal development plan, and in October 2004 we released an updated estimate of capital costs. The capital cost estimate is approximately $560 million, $65 million or 13% more than estimated in the 2000 updated feasibility study. The increase in the estimated capital cost was due to changes in the infrastructure scope (including the decision to haul concentrates by rail rather than by truck), higher energy and raw material costs and other normal cost escalations. The capital cost estimate includes pre-stripping, engineering, procurement, construction, and freight necessary to commence production, as well as appropriate taxes, duties and levies under Bolivian law. The estimate excludes working capital, advances to the companies constructing the power line and port, escalation from the original constant dollar estimate and certain production enhancements which were added subsequent to the October 2004 estimate. Total project funding from January 1, 2004 going forward, including all additional amounts described above that were not included in the October 2004 estimate, is approximately $650 million. Of this amount, approximately $26 million in capital costs were spent at the San Cristóbal Project during 2004 and approximately $27 million of the costs relate to amounts that may be paid using ordinary shares rather than cash.
In November 2004, we entered into an agreement with an engineering and construction firm that will manage the engineering, procurement and construction for the San Cristóbal Project. In January 2005, we entered into an Open Pit Contract Mining Services Agreement with a contract mining firm that will provide services including construction and maintenance of site access and haul roads, open pit preproduction stripping, mining of ore and waste, construction and management of waste dumps and ore stockpiles, and various other contract mining services.
29
During 2004 we adopted the fair value based method of accounting for stock options as presented in Statement of Financial Accounting Standards No. 123 ("FAS No. 123"), Accounting for Stock-Based Compensation, as amended by FAS No. 148, Accounting for Stock-Based CompensationTransition and Disclosure, effective as of the beginning of the year. We used the "modified prospective method" of transition, as defined in FAS No. 123, where employee stock-based compensation cost was recognized from January 1, 2004 as if the fair value based accounting method in FAS No. 123 had been used to account for all employee awards granted, modified, or settled in fiscal years beginning after December 15, 1994. As a result, compensation costs of $10.1 million were recognized including $1.4 million capitalized and $8.7 million charged to expense for the year ended December 31, 2004. The costs include a charge of approximately $4.1 million relating to the modification of stock awards previously granted to the retiring Apex Silver Chairman, another retiring director and a retiring employee.
Results of Operations
Exploration. Our exploration expenses, including property holding costs and allocated administrative expenses, were $5.3 million for the year ended December 31, 2004, as compared to $2.7 and $3.9 for the years ending December 31, 2003 and 2002 respectively. The 2003 and 2002 amounts include the $0.3 million and $0.9 million value of Ordinary Shares issued to consultants and to acquire mineral rights for the respective years. The increase in exploration costs during 2004 as compared to the previous two years is primarily the result of our increased exploration activities in Bolivia and Peru.
Administrative. Administrative expense was $18.2 million for the year ended December 31, 2004, compared to $4.6 million and $5.5 million for the years ended December 31, 2003 and 2002, respectively. The increase in administrative expense during 2004 is primarily the result of non-cash stock compensation expense of $8.7 million following the adoption of FAS No. 123, which includes expense of approximately $4.1 million relating to the modification of stock awards previously granted to the retiring Chairman of Apex Silver, another retiring director and a retiring employee. In addition, the 2004 administrative expense includes the $2.5 million value of shares granted to the retiring Chairman of Apex Silver as well as a one time $1.5 million payment made to a consultant for financial advisory and consulting services associated with the equity and convertible notes offerings completed during 2004. During 2004, the Company also spent approximately $1.0 million related to the documentation and testing of its internal controls as required by the Sarbanes-Oxley Act. Administrative costs during 2004 also increased as the result of the addition of personnel and the related support costs in anticipation of the development of our San Cristóbal project.
The decrease in administrative expenses from $4.6 million for the year ended December 31, 2003 compared to $5.5 million for the same period of 2002 is primarily the result of cost savings associated with the reduction of personnel and office facilities as part of a cash conservation policy that was in effect during that period.
Interest and Other Income. Our interest and other income for the year ended December 31, 2004 was $6.1 million compared to $0.6 million and $0.9 million for the years ended December 31, 2003 and 2002, respectively. The 2004 increase is the result of interest earned on the higher cash balances we held as a result of the ordinary share and convertible debt offerings completed during 2004. The decrease in interest and other income for the year ended December 31, 2003 compared to the same period of 2002 is primarily the result of lower interest rates during 2003.
Gains and LossesCommodity Derivatives. We recorded a trading gain for the year ended December 31, 2004 of approximately $0.8 million compared to a gain of approximately $0.7 and a trading loss of $0.1 million for the comparable period in 2003 and 2002, respectively. The improvement in 2004 and 2003 as compared to the prior year is primarily the result of rising silver, zinc and lead prices. From inception until December 31, 2004, we have recorded a gain of approximately $1.0 million related to the metals trading program. That amount represents approximately $1.5 million of cash gains partially offset
30
by $0.5 million of unrealized losses at December 31, 2004. Under Statement of Financial Accounting Standards No. 133, Accounting For Derivative Instruments and Hedging Activities ("FAS 133"), fair value measurements may vary substantially from period to period based on spot prices, forward prices and quoted option volatilities.
GainsForeign Currency Derivatives. During 2004 we placed an order for certain long lead equipment related to the San Cristóbal project. The purchase price of the equipment was denominated in Euros. To partially offset the potential deterioration of the U.S. dollar relative to the Euro, we entered into a foreign currency collar transaction utilizing puts and calls. For the year ended December 31, 2004 the Company recognized a gain related to the transaction of approximately $1.4 million based on the fair market value of the puts and calls at that date. We had no similar foreign currency transactions in place during 2003 or 2002 and therefore had no gains or losses related to foreign currency derivatives. Under FAS 133, fair value measurements may vary substantially from period to period based on spot prices, forward prices and quoted option volatilities.
Interest and Other Borrowing Costs. For the year ended December 31, 2004 we recorded $3.6 million of expense for interest and amortized borrowing cost compared to no interest or borrowing costs for the years end December 31, 2003 and 2002. The 2004 expense is entirely related to the 2.875% Convertible Senior Subordinated Notes due 2024 and the 4.0% Convertible Senior Subordinated Notes due 2024, each of which were issued during 2004.
Income Taxes. Apex Silver Mines Corporation, our U.S. management services company, is subject to U.S. income taxes. Other than amounts payable by Apex Silver Mines Corporation, we pay no income tax in the U.S. since we are incorporated in the Cayman Islands and do not conduct or expect to conduct business in the U.S. that would generate U.S. taxable income. The Cayman Islands currently impose no corporate taxation. We have been granted an exemption until January 16, 2015 from any form of corporate taxation that may subsequently be adopted in the Cayman Islands. Deferred tax assets of approximately $12.9 million at December 31, 2004, resulting from operating loss carry-forwards of our subsidiaries, have been entirely offset by valuation allowances.
Liquidity and Capital Resources
At December 31, 2004 our aggregate cash, short term investments and long term investments amounted to $525.4 million compared to an aggregate of $40.3 in cash, short term investments and long term investments at December 31, 2003. The amounts held at December 31, 2004 include $27.7 million in cash and cash equivalents, $419.6 million in short term investments and $78.0 million in long term investments. In addition to these amounts, at December 31, 2004, we had $3.1 million of cash that has been restricted to collateralize outstanding letters of credit and $15.3 million of investments that have been restricted and at maturity will provide the amounts necessary to pay the first three years interest payments on the 4.0% Convertible Senior Subordinated Notes due 2024.
The increase in our cash balance at December 31, 2004 is the result of net proceeds of $208.6 million received from the sale of Ordinary Shares, net proceeds of $328.1 million from the issuance of the Notes (net of $11.9 million of deferred financing costs) and $1.8 million received from the exercise of stock options by employees and a director. The increase was partially offset by approximately $26.6 million invested in property, plant and equipment primarily related to the development of the San Cristóbal Project and $9.2 million used to fund operations, property holding costs and administrative costs, net of interest and other income and a $0.1 million payment on debt. In addition, as noted above, we have invested $497.6 million in short and long term investments and $15.3 million in restricted investments to cover the payment of the first three years of interest on the 4.0% Convertible Senior Subordinated Notes due 2024 pursuant to a Pledge and Security Agreement entered into with the initial purchasers of the Notes.
31
During 2004 we completed updating the San Cristóbal development plan, resulting in estimated capital costs of approximately $560 million. This capital cost estimate, which we publicly disclosed in October 2004, includes pre-stripping, engineering, procurement, construction, and freight necessary to commence production, as well as appropriate taxes, duties and levies under Bolivian law. The estimate excludes approximately $27 million of working capital, $22 million expected to be advanced to the company constructing the power line, $6 million expected to be advanced to the company constructing the port facilities, and $20 million for escalation from the original constant dollar estimate. Advances for the power line and port facility providers are expected to be recouped through credits applied against payments for the contracted services. The estimate also excludes approximately $12 million in capital costs related to production enhancements added subsequent to the October 2004 estimate. Total project funding from January 1, 2004 going forward, including the additional amounts described above, is approximately $650 million. Of this amount, approximately $26 million in capital costs were spent at the San Cristóbal Project during 2004 and approximately $27 million of the costs relate to amounts that may be paid using ordinary shares rather than cash.
We continue to work with Barclays and BNP Paribas to secure commercial bank debt financing and develop other financing options for San Cristóbal as part of a total financing package that may incorporate support from export credit agencies, multilateral agencies and other public lenders. During 2004 we also filed a universal shelf registration statement, on Form S-3, with the Securities and Exchange Commission. The registration became effective in August 2004, and allows us to sell up to $200 million in any combination of equity or debt securities as described in the registration statement in one or more offerings. There can be no assurance we will be able to obtain the required remaining financing on terms that we find attractive, or at all.
During 2005 we expect to spend up to approximately $250 million on equipment procurement, plant construction, infrastructure development, engineering and other costs related to our San Cristóbal project. In addition, in order to maintain our current portfolio of exploration properties, we expect to make lease, patent and option payments during the next twelve months of about $0.5 million. We expect up to $5 million of discretionary spending on attractive exploration opportunities. Total administrative expenses are expected to be approximately $16 million during 2005. Interest earned from short term investments and other income should approximate $12 million. We plan to fund our project and operating expenditures for the next twelve months from our existing cash balances.
Off Balance Sheet Arrangements
We have no off balance sheet arrangements.
Table of Contractual Obligations
The following table summarizes our contractual obligations at December 31, 2004:
Contractual Obligations |
Total |
Less Than 1 Year |
1-3 Years |
3-5 Years |
Thereafter |
||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
(thousands) |
||||||||||||||
Debt | $ | 340,586 | $ | 599 | $ | | $ | | $ | 339,987 | |||||
Interest payments due on debt | 107,776 | 11,349 | 22,699 | 22,699 | 51,029 | ||||||||||
Capital Leases | | | | | | ||||||||||
Operating Leases | 1,520 | 300 | 612 | 608 | | ||||||||||
San Cristobal property leases | 6,120 | 360 | 720 | 720 | 4,320 | ||||||||||
Purchase Obligations | 30,922 | 30,697 | 225 | | | ||||||||||
Other GAAP Liabilities | | | | | |
All of the debt except the current portion is related to the 2.875% and 4.0% Convertible Senior Subordinated Notes due 2024. The interest payments due are also related to the 2.875% and 4.0%
32
Convertible Senior Subordinated Notes due 2024. Total interest payments due on debt includes only those payments expected to be made through 2014 based on our expectation that the holders may require us to repurchase the notes in 2014. The operating lease obligations are related to the office facilities at our corporate headquarters. The San Cristóbal property lease payments are all related to payments the Company must make to the Bolivian government to maintain its rights to the San Cristóbal mining concessions. The purchase obligations are all related to orders placed for long lead time equipment being purchased for the San Cristóbal Project.
From time to time we enter into lease option agreements related to exploration properties that are of interest to us. These agreements normally contain escalating lease payments required to maintain our exploration rights to the property. Such agreements are not included in the above table because exploration success is historically low and the agreements can be terminated by us at any time.
Environmental Compliance
Our current and future exploration and development activities, as well as our future mining and processing operations, are subject to various federal, state and local laws and regulations in the countries in which we conduct our activities. These laws and regulations govern the protection of the environment, prospecting, development, production, taxes, labor standards, occupational health, mine safety, toxic substances and other matters. We expect to be able to comply with those laws and do not believe that compliance will have a material adverse effect on our competitive position. We intend to obtain all licenses and permits required by all applicable regulatory agencies in connection with our mining operations and exploration activities. We intend to maintain standards of environmental compliance consistent with regulatory requirements.
Critical Accounting Policies
The selection and application of accounting policies is an important process that has developed as our business activities have evolved and as the accounting rules have changed. Accounting rules generally do not involve a selection among alternatives, but involve an implementation and interpretation of existing rules, and the use of judgment, to the specific set of circumstances existing in our business. We comply with all applicable rules on or before their adoption, and we believe the proper implementation and consistent application of the accounting rules is critical. Our critical accounting policies are discussed below. You should also read Note 2 of the accompanying Notes to the Consolidated Financial Statements included in this Form 10-K.
Our financial condition and results of operations as reflected in our financial statements are affected by estimates that we, or experts that we have retained, have made as to our proven and probable reserves. Reserve estimates involve subjective judgment and are based on numerous assumptions that may later prove to be inaccurate. These estimates include engineering evaluations of assay values derived from samplings of drill holes and other openings. Additionally, changes in the market prices of metals may render certain reserves containing relatively lower grades of mineralization uneconomic to mine. Further, availability of permits, changes in operating and capital costs, and other factors could materially and adversely affect ore reserves. Our current proven and probable reserve estimates at San Cristóbal total approximately 219 million tonnes of ore grading 64.69 grams per tonne silver, 1.60% zinc and 0.59% lead, containing approximately 456 million ounces of silver, 7.7 billion pounds of zinc and 2.8 billion pounds of lead. The reserves are based on $5.37 per ounce silver, $0.40 per pound zinc and $0.28 per pound lead. These prices represent the three year average prices for each of the metals as per guidelines established by the Securities and exchange Commission.
To complete the project financing on San Cristóbal, we may be required to hedge a portion of our planned production. In addition, when San Cristóbal enters production, we may sell forward a portion of our production and use price-hedging techniques to mitigate some of the risks associated with fluctuating
33
metals prices. We currently engage in limited metals trading activities utilizing puts and calls and other market instruments in anticipation of potential lender requirements for the San Cristóbal Project financing. We measure the fair value of open positions at each reporting period and record the difference in the carrying value to current earnings, in accordance with FAS 133. Under FAS 133, fair value measurements may vary substantially from period to period based on spot prices, forward prices and quoted option volatilities.
ITEM 7A: QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Currently, our major principal cash balances are held in U.S. dollars. We maintain minimum cash balances in foreign currencies and therefore have a relative low exposure to currency fluctuations. During 2004 we placed an order for certain long lead equipment related to the San Cristóbal project. The purchase price of the equipment was denominated in Euros. To partially offset the potential deterioration of the U.S. dollar relative to the Euro, we entered into a foreign currency collar transaction utilizing puts and calls. For the year ended December 31, 2004 we recognized a gain related to the transaction of approximately $1.4 million based on the fair market value of the puts and calls at that date. Because we conduct our activities in several foreign countries, we may in the future engage in additional hedging activities to minimize the risk of exposure to currency and interest rate fluctuations.
To complete the project financing for San Cristóbal, we expect to be required to hedge a portion of our planned production. In addition, when San Cristóbal enters production, we may sell forward a portion of our production and use price hedging techniques to mitigate some of the risks associated with fluctuating metals prices. We currently engage in limited metals trading activities, utilizing puts and calls and other market instruments in anticipation of potential lender requirements for the San Cristóbal Project financing. We recorded a trading gain for the year ended December 31, 2004 of approximately $0.8 million. From our inception until December 31, 2004, we have recorded a gain of approximately $1.0 million related to the metals trading program. This amount represents approximately $1.5 million of cash gains partially offset by $0.5 million of unrealized losses at December 31, 2004. See "Management's Discussion and Analysis of Financial Condition and Results of OperationsResults of Operations."
ITEM 8: FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
The consolidated financial statements and supplementary information filed as part of this Item 8 are listed under Part IV, Item 15, "Exhibits, Financial Statement Schedules and Reports on Form 8-K" and contained in this Form 10-K at page F-1.
ITEM 9: CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
Not applicable.
ITEM 9A: CONTROLS AND PROCEDURES
Disclosure Controls and Procedures
We maintain disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that we file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to Apex Silver's management, including its Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required financial disclosure.
As of the end of the period covered by this report, we carried out an evaluation, under the supervision and with the participation of our Disclosure Committee and management, including the Chief Executive
34
Officer and Chief Financial Officer, of the effectiveness of the design and operation of our disclosure controls and procedures pursuant to Exchange Act Rule 13a-15(b) under the Securities Exchange Act of 1934. Based upon, and as of the date of, this evaluation, the Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were not effective, because of the material weakness discussed below. In light of the material weakness described below, we performed additional analysis and other post-closing procedures to ensure our consolidated financial statements are prepared in accordance with generally accepted accounting principles. Accordingly, management believes that the financial statements included in this report fairly present in all material respects our financial condition, results of operations and cash flows for the periods presented.
Management's Report on Internal Control over Financial Reporting
Apex Silver's management is responsible for establishing and maintaining effective internal control over financial reporting as defined in Rule 13a-15(f) under the Securities Exchange Act of 1934. Our internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Management has assessed the effectiveness of our internal control over financial reporting as of December 31, 2004. In making its assessment of internal control over financial reporting, management used the criteria described in "Internal ControlIntegrated Framework" issued by the Committee of Sponsoring Organizations of the Treadway Commission.
A material weakness is a control deficiency, or combination of control deficiencies, that results in more than a remote likelihood that a material misstatement of the annual or interim financial statements will not be prevented or detected. As of December 31, 2004, we did not maintain effective controls over the financial reporting process because we lacked a sufficient complement of personnel with a level of accounting expertise that is commensurate with our financial reporting requirements. This control deficiency resulted in the following adjustments to our financial statements:
35
Additionally, the ineffective controls over the financial reporting process are a control deficiency that could result in a material misstatement of annual or interim financial statements that would not be prevented or detected.
Management determined that the ineffective controls over the financial reporting process are a control deficiency that constitutes a material weakness. Because of this material weakness, management has concluded that Apex Silver did not maintain effective internal control over financial reporting as of December 31, 2004, based on the criteria in the Internal ControlIntegrated Framework.
Management's assessment of the effectiveness of Apex Silver's internal control over financial reporting as of December 31, 2004, has been audited by PricewaterhouseCoopers LLP, our independent registered public accounting firm, as stated in their report which appears herein.
Remediation of Material Weakness
As discussed in Management's Report on Internal Control over Financial Reporting, we identified a material weakness in internal control over financial reporting. As of the end of the period covered by this report, we have not fully remediated the material weakness in our internal control over financial reporting. In order to address the material weakness, we have taken the following remedial actions:
Changes in Internal Control over Financial Reporting
Except as otherwise discussed herein, there have been no changes in our internal control over financial reporting during the most recently completed fiscal quarter that have materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.
Attestation Report of the Registered Public Accounting Firm
The attestation report of our registered public accounting firm, PricewaterhouseCoopers LLP, is included beginning on page F-2 of the financial statements included in this annual report.
None.
36
ITEM 10: DIRECTORS AND EXECUTIVE OFFICERS OF THE REGISTRANT
Information regarding directors of Apex Silver is incorporated by reference to the section entitled "Election of Directors" in our definitive proxy statement to be filed with the Securities and Exchange Commission pursuant to Regulation 14A in connection with the 2005 annual meeting of shareholders (the "Proxy Statement"). See "Part IItems 1 and 2: Business and PropertiesManagement" for information regarding executive officers of Apex Silver and certain executive officers of Apex Corporation.
ITEM 11: EXECUTIVE COMPENSATION
Reference is made to the information set forth under the caption "Executive Compensation and Other Information" in the Proxy Statement, which information (except for the report of the board of directors on executive compensation and the performance graph) is incorporated by reference in this report on Form 10-K.
ITEM 12: SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT
Reference is made to the information set forth under the caption "Security Ownership of Principal Shareholders and Management" in the Proxy Statement, which information is incorporated by reference in this report on Form 10-K.
ITEM 13: CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS
Reference is made to the information contained under the caption "Certain Transactions" contained in the Proxy Statement, which information is incorporated by reference in this report on Form 10-K.
ITEM 14: PRINCIPAL ACCOUNTANT FEES AND SERVICES
Reference is made to the information contained under the caption "Audit Committee Report" contained in the Proxy Statement, which information is incorporated by reference in this report on Form 10-K.
37
ITEM 15: EXHIBITS, FINANCIAL STATEMENT SCHEDULES, AND REPORTS ON FORM 8-K
Exhibit Number |
Description of Exhibits |
|
---|---|---|
3.1 | Amended and restated Memorandum of Association of the Company.(1) | |
3.2 |
Amended and restated Articles of Association of the Company.(1) |
|
4.1 |
Specimen of certificates representing the Company's Ordinary Shares, par value U.S. $0.01 each.(2) |
|
4.2 |
Form of Warrant issued in connection with the January 2004 private placement.(3) |
|
4.3 |
Indenture, dated March 16, 2004, between Apex Silver Mines Limited and The Bank of New York, as Trustee.(4) |
|
4.4 |
Form of Global Note, dated March 16, 2004.(4) |
|
4.5 |
Form of Global Note, dated April 1, 2004.(5) |
|
4.6 |
Form of Warrant issued in connection with the offering of our Ordinary Shares pursuant to a prospectus supplement filed April 3, 2003.(6) |
|
4.7 |
Form of Warrant issued in connection with the offerings of our Ordinary Shares pursuant to prospectus supplements filed May 22, 2002 and September 10, 2003.(6) |
|
4.8 |
Indenture, dated as of October 15, 2004, by and between Apex Silver Mines Limited and The Bank of New York, as Trustee.(7) |
|
4.9 |
Form of Global Note, dated October 15, 2004.(7) |
|
4.10 |
Form of Global Note, dated December 14, 2004.(8) |
|
10.1 |
Management Services Agreement among the Company and its subsidiaries.(9) |
|
10.2 |
Non-Employee Directors' Share Plan, as amended.(10) |
|
10.3 |
2004 Equity Incentive Plan.(11) |
|
10.4 |
Form of Incentive Share Option Agreement pursuant to the 2004 Equity Incentive Plan.* |
|
10.5 |
Form of Restricted Shares Award Agreement pursuant to the 2004 Equity Incentive Plan.* |
|
10.6 |
Form of Option Grant to Non-Employee Directors dated April 10, 1997.(12) |
|
10.7 |
Employment contract between the Company and Marcel F. DeGuire, dated July 23, 1996.(10) |
|
10.8 |
Employment contract between the Company and Mark A. Lettes, dated May 19, 1998.(13) |
|
38
10.9 |
Employment contract between the Company and Keith R. Hulley, dated August 4, 1996.(10) |
|
10.10 |
Registration Rights Agreement, dated October 28, 1997, by and among the Company, Silver Holdings, Consolidated, Argentum, Aurum LLC and Thomas S. Kaplan.(2) |
|
10.11 |
Form of Change of Control Agreement.(14) |
|
10.12 |
Registration Rights Agreement, dated March 16, 2004, among Apex Silver Mines Limited, Barclays Bank PLC and Citigroup Global Markets Inc.(4) |
|
10.13 |
Registration Rights Agreement, dated as of October 15, 2004, by and between Apex Silver Mines Limited and Citigroup Global Markets Inc.(7) |
|
10.14 |
Collateral Pledge and Security Agreement dated as of October 15, 2004, among Apex Silver Mines Limited as Pledgor, The Bank of New York as Trustee and The Bank of New York as Collateral Agent.(7) |
|
10.15 |
Amended and Restated Collateral Pledge and Security Agreement, dated December 14, 2004 among Apex Silver Mines Limited as Pledgor, The Bank of New York as Trustee and The Bank of New York as Collateral Agent.(8) |
|
10.16 |
EPCM Services Supply Agreement between Minera San Cristóbal, S.A. and Aker Kvaerner Metals Inc., Dated November 8, 2004.(14) |
|
10.17 |
Open Pit Contract Mining Services Agreement between Minera San Cristóbal, S.A. and Washington Group Bolivia, S.R.L.(15)* |
|
21 |
List of Subsidiaries.* |
|
23.1 |
Consent of Independent Registered Public Accounting Firm.* |
|
23.2 |
Consent of Mine Reserves Associates, Inc.* |
|
31.1 |
Certification of Chief Executive Officer of Periodic Report Pursuant to Rule 13a-14(a) and Rule 15d-14(a) (Section 302 of the Sarbanes-Oxley Act of 2002). |
|
31.2 |
Certification of Chief Financial Officer of Periodic Report Pursuant to Rule 13a-14(a) and Rule 15d-14(a) (Section 302 of the Sarbanes-Oxley Act of 2002). |
|
32.1 |
Certificate of Principal Executive Officer and Principal Financial Officer pursuant to 18 U.S.C. 1350 (Section 906 of the Sarbanes-Oxley Act of 2002). |
39
40
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed April 8, 2005 on its behalf by the undersigned, thereunto duly authorized.
APEX SILVER MINES LIMITED |
||||
By: |
/s/ JEFFREY G. CLEVENGER Jeffrey G. Clevenger President and Chief Executive Officer (Principal Executive Officer) |
41